Westlink Industry Park - Planning Documentation

Stage 1 SSD

Below are all the documents required by the State Government to approve this development site.

RTS Response to Submissions Report April 2022

RTS Letter - Submissions

RTS Construction Traffic Issue I

RTS Appendix A Staging Plan

RTS Appendix A - Architectural Plans Combined

RTS Appendix A Architectural Plans Part A

RTS Appendix A Architectural Plans Part B

RTS Appendix A Architectural Plans Part C

RTS Appendix A Architectural Plans - Amended Elevations

RTS Appendix B Urban Design Report

RTS Appendix C Consultation Summary Table

RTS Appendix C - Consultation Summary TOA

RTS Appendix D Survey

RTS Appendix E Subdivision Plan

RTS Appendix F Landscape Masterplan Report

RTS Appendix F On Lot Landscape Lot 1

RTS Appendix F On Lot Landscape Lot 1A

RTS Appendix F On Lot Landscape Lot 1B

RTS Appendix F On Lot Landscape Lot 2

RTS Appendix F On Lot Landscape Lot 3

RTS Appendix F On Lot Landscape Lot 4

RTS Appendix F On Lot Landscape Lot 5

RTS Appendix G QS Report

RTS Appendix H Consultation Outcomes Report

RTS Appendix I Civil Plans On Lot

RTS Appendix I Civil Report

RTS Appendix I Civil Plans Estate Part A

RTS Appendix I Civil Plans Estate Part B

RTS Appendix I Civil Plans Estate Part C

RTS Appendix J VIA Part A

RTS Appendix J VIA Part B

RTS Appendix J VIA Part C

RTS Appendix J VIA Part D

RTS Appendix J VIA Part E

RTS Appendix J VIA Part F

RTS Appendix J VIA Part G

RTS Appendix J VIA Part H

RTS Appendix J VIA Part I

RTS Appendix J VIA Part J

RTS Appendix K TMAP

RTS Appendix L NIA Response to Submissions

RTS Appendix L NIA

RTS Appendix M Preliminary Risk Assessment

RTS Appendix N BDAR

RTS Appendix O Heritage Impact Assessment

RTS Appendix P Archaeological Technical Report

RTS Appendix P ACHAR Part A

RTS Appendix P ACHAR Part B

RTS Appendix Q Social and Economic Impact Report

RTS Appendix R PSI 59-63 Abbotts Road

RTS Appendix R PSI 290-308 Aldington Road Part A

RTS Appendix R PSI 290-308 Aldington Road Part B

RTS Appendix R PSI 290-308 Aldington Road Part C

RTS Appendix R PSI 290-308 Aldington Road Part D

RTS Appendix R PSI 290-308 Aldington Road Part E

RTS Appendix S Geotech 59-63 Abbotts Road

RTS Appendix T Geotech 290-308 Aldington Road

RTS Appendix U Bushfire Report

RTS Appendix U Bushfire Response to Submission

RTS Appendix V Air Quality Report

RTS Appendix W Waste Management Plan

RTS Appendix X Sustainability Management Plan

RTS Appendix Y BCA Report

RTS Appendix Z Mamre Road DCP Compliance Table

RTS Appendix AA Wildlife Management Plan

RTS Appendix BB RAP Part A

RTS Appendix BB RAP Part B

RTS Appendix CC DSI Part A

RTS Appendix CC DSI Part B

RTS Appendix DD Salinity Report

For any construction related enquiries relating to the Stage 1 Development, contact ESR directly:

Phone: 1800 270 980 (9am-5pm Monday to Friday)

Email: aus_development@au.esr.com



Stage 2 SSDA

1. Appendix OO3 - Construction Materials

2. Appendix OO2 - Building Materials

3. Appendix OO1 - Life Cycle Carbon Report

4. SSD-46983729 - Westlink Stage 2 - EIS

5. Appendix A - SEARs Compliance Table

6. Appendix B - Architectural Drawings

7. Appendix C - Statutory Compliance Table

8. Appendix D - Community Engagement Table

9. Appendix E - Consolidated Mitigation Measures

10. Appendix G1 - Detailed Site Survey (Lot 3, 4 DP 250002)

11. Appendix G2 - Site Survey (Lot 11, 12, 13 DP 253503)

12. Appendix H - Urban Design Report

13. Appendix I1 - Civil Drawings

14. Appendix I2 - On-lot Civil Drawings

15. Appendix J1 - Landscape Drawings

16. Appendix J2 - Landscape Drawings (Trunk Drainage Channel)

17. Appendix K1 - Landscape Report

18. Appendix K2 - Tree Canopy Plan

19. Appendix L - Remedial Action Plan

20. Appendix M - Civil Infrastructure Report

21. Appendix N - Water and Stormwater Management Plan

22.1 Appendix N - Flow Duration Curve - Westlink Stage 2

22.2 Appendix N - MUSIC Model - Westlink Stage 2

23. Appendix O - Sydney Water Correspondance

24. Appendix P1 - Trunk Drainage Letter

25. Appendix P2 - Trunk Drainage Drawings

26. Appendix Q - Plan of Proposed Subdivision

27. Appendix R - Bio-Certification Letter

28. Appendix S - Mamre Road Precinct DCP Compliance Table

29. Appendix T - CPTED Report

30. Appendix U - Engagement Outcomes Report

31. Appendix V - ACHAR (Redacted)

32. Appendix W - BCA Assessment Report

33. Appendix X - Fire Safety Design Letter

34. Appendix Y - Visual Impact Assessment

35. Appendix Z - Transport Management

36. Appendix AA - Construction Traffic Management Plan

37. Appendix BB - ESD Report

38. Appendix CC - Riparian Assessment Report

39. Appendix DD - Air Quality Impact Assessment

40. Appendix EE - Noise and Vibration Impact Assessment

41. Appendix FF1 - Desktop Geotechnical Assessment

42. Appendix FF2 - Geotech DD Assessment (1030-1048 Mamre Road)

43. Appendix FF3 - Geotechnical Letter

44. Appendix FF3 - Geotech DD Assessment (1050-1064 Mamre Road)

45. Appendix GG - CPESC Endorsement Letter

46. Appendix HH - Detailed Site Investigation

47. Appendix II - Flood Impact Assessment

48. Appendix JJ - Waste Management Plan

49. Appendix KK - Archaeological Report (Redacted)

50. Appendix LL - Heritage Impact Statement

51. Appendix MM - Social and Economic Impact Assessment

52. Appendix NN - Bushfire Hazard Assessment

53. QS Report

54. Appendix OO4 - Embodied Emissions Materials Form (NSW SEPP)

55. Appendix F - Cost Estimate Report

1. SSD-46983729 AQIA RFI 150825

2. Stormwater Interim Arrangement Plan Sep 25

3. MUS008-03-20-748-WESTLINK STAGE 2 RFI

4. Water and Stormwater Management Plan Sep 2025

5. Final Civil Plan Pack Sep 2025

6. Response to Requests for Additional Information

7. Attachment A - Response to RFI

8. Attachment B - Response to RFI

9. Attachment C - Updated Architectural Drawings

10. Attachment D - Landscape Drawings

11. Attachment E - Updated Plan of Subdivision

12. Attachment F - Updated Estate Civil Drawings

13. Attachment G - Updated On-Lot Civil Drawings

14. Attachment H - Updated Civil Infrastructure Report

15. Attachment I - Updated Water and Stormwater Management Plan

16. Attachment J - Updated Trunk Drainage Drawings

17. Attachment K - Updated Trunk Drainage Design Report

18. Attachment L - Updated Flood Impact

19. Attachment M - Transport Addendum

20. Attachment N - Updated Noise and Vibration Assessment

21. Attachment O - Updated Air Quality Impact Assessment

22. Attachment P - Aboriginal Cultural Heritage Addendum Letter

23. Attachment Q - Updated Consolidated Mitigation Measures

24. Attachment R - Mamre Road DCP Compliance Table

25. Attachment S - CPCP Land Category Map

26. Attachment T - Wildlife Management Plan

27. Attachment U - Groundwater Letter

28. Attachment V - Remediation Action Plan Addendum

29. Attachment W - TfNSW Response to Trunk Drainage

30. Attachment X - Transgrid Response to Trunk Drainage

31. Attachment Y - Acceptance - Asset Relocation Application

32. Attachment Z - Trunk Drainage Channel Shadow Diagrams

33. Attachment AA - Letter of Offer to Penrith City Council

34. Attachment BB - Council Comments on Letter of Offer

35. Updated Flow Duration Curve (SSD-46983729)

36. Updated MUSIC Model

37. Updated Flow Duration Curve (SSD-46983729)

38. RFI 3 Response letter - Aug 2025

39. RFI 3 Attachment A Penrith City Council Letter of Acceptance

40. RFI 3 Attachment B TfNSW Road Lot 6 Coordinated Design

41. RFI 3 Attachment C Flood Impact and Risk Assessment

42. RFI 3 Attachment D-1 Civil and Stormwater Plan - Estate

43. RFI 3 Attachment D-2 Water and Stormwater Management Plan

44. Attachment D-3 MUSIC Model

45. RFI 3 Attachment D-4 Interim Stormwater Plan Westlink Stage 1-2

46. SSD-46983729 Traffic RFI 170424

47. SSD-46983729 AQIA RFI 300424

48. SSD-46983729 RTS RFI 41024

49. SSD-46983729 RFI 080425

50. Response to Construction Air Quality