Stage 1 SSD
Below are all the documents required by the State Government to approve this development site.
Environmental Impact Assessment
Appendix A - Architectural Plans (1)
Appendix B - Urban Design Report Part 1
Appendix B - Urban Design Report Part 2
Appendix E - Plan of Subdivision
Appendix G - Quantity Surveyor's Report
Appendix H - Consultation Outcomes Report
Appendix I - Civil Infrastructure
Appendix J - Visual Impact Assessment Part 1
Appendix J - Visual Impact Assessment Part 2
Appendix J - Visual Impact Assessment Part 3
Appendix J - Visual Impact Assessment Part 4
Appendix L - Noise and Vibration Assessment
Appendix M - Preliminary Risk Assessment
Appendix O - Heritage Impact Assessment
Appendix Q - Social and Economic Impact
Appendix S - Geotech (59-63 Abbotts Rd)
Appendix T - Geotech (290-308 Aldington Rd)
Appendix U - Bushfire Protection Assessment
Appendix V - Air Quality Assessment
Appendix W - Waste Management Plan
RTS Response to Submissions Report April 2022
RTS Construction Traffic Issue I
RTS Appendix A - Architectural Plans Combined
RTS Appendix A Architectural Plans Part A
RTS Appendix A Architectural Plans Part B
RTS Appendix A Architectural Plans Part C
RTS Appendix A Architectural Plans - Amended Elevations
RTS Appendix B Urban Design Report
RTS Appendix C Consultation Summary Table
RTS Appendix C - Consultation Summary TOA
RTS Appendix E Subdivision Plan
RTS Appendix F Landscape Masterplan Report
RTS Appendix F On Lot Landscape Lot 1
RTS Appendix F On Lot Landscape Lot 1A
RTS Appendix F On Lot Landscape Lot 1B
RTS Appendix F On Lot Landscape Lot 2
RTS Appendix F On Lot Landscape Lot 3
RTS Appendix F On Lot Landscape Lot 4
RTS Appendix F On Lot Landscape Lot 5
RTS Appendix H Consultation Outcomes Report
RTS Appendix I Civil Plans On Lot
RTS Appendix I Civil Plans Estate Part A
RTS Appendix I Civil Plans Estate Part B
RTS Appendix I Civil Plans Estate Part C
RTS Appendix L NIA Response to Submissions
RTS Appendix M Preliminary Risk Assessment
RTS Appendix O Heritage Impact Assessment
RTS Appendix P Archaeological Technical Report
RTS Appendix Q Social and Economic Impact Report
RTS Appendix R PSI 59-63 Abbotts Road
RTS Appendix R PSI 290-308 Aldington Road Part A
RTS Appendix R PSI 290-308 Aldington Road Part B
RTS Appendix R PSI 290-308 Aldington Road Part C
RTS Appendix R PSI 290-308 Aldington Road Part D
RTS Appendix R PSI 290-308 Aldington Road Part E
RTS Appendix S Geotech 59-63 Abbotts Road
RTS Appendix T Geotech 290-308 Aldington Road
RTS Appendix U Bushfire Report
RTS Appendix U Bushfire Response to Submission
RTS Appendix V Air Quality Report
RTS Appendix W Waste Management Plan
RTS Appendix X Sustainability Management Plan
RTS Appendix Z Mamre Road DCP Compliance Table
Appendix A - Architectural Plans
Appendix B - Urban Design Statement
Appendix C - Plan of Subdivision
Appendix D - Landscape Montage
Appendix D1 - Landscape Masterplan
Appendix D2 - Lot 1 On Lot Landscape
Appendix D3 - Lot 4 On Lot Landscape
Appendix D4 - Tree Canopy Plan
Appendix E - Civil and Water Management Strategy
Appendix F1- Civil Infrastructure
Appendix G - Visual Impact Assessment
Appendix H - Transport Management and Access Report
Appendix I - Construction Traffic Management Plan
Appendix K - Heritage Impact Statement
Appendix L1 - Flood Impact Assessment
Appendix L2 - Flood Risk Assessment
Appendix N - Air Quality Impact Assessment
Appendix O - Waste Management Plan
Appendix P - Ecologically Sustainable Development
Appendix R - Mamre Road DCP Compliance Table
Appendix S - QS Cost Summary Report
Appendix T - State VPA Proposed Works
Appendix U - Local VPA Proposed Works
Appendix V - Local VPA Ultimate Road Reference Design
Amended Application RFI Response
Amended Application RFI Response (1)
AT&L re. Retaining Wall April 2023
A - Updated Mamre Road DCP Compliance Table
A AA RFI - Architectural Plans
B - Industry and Employment SEPP Compliance Table
B AA RFI - Stage 1 On Lot Civil Plans
B AA RFI - Stage 1 Infrastructure Civil Plans
C - Revised Architectural Plans
C AA RFI - MUSIC Model and Flow Curve
C AA RFI - Stage 1 Civil Infra & Water Management
Costin Roe re. Retaining Wall April 2023
D AA RFI - Landscape Masterplan
Douglas Partners re. Retaining Wall April 2023
E AA RFI - Urban Design Report
ESR re. Retaining Wall April 2023
G1 - Revised Geotechnical Report
J - Updated Civil and Water Management Report
Revised canopy cover plan (issue E) Feb 2023
Revised estate plan - Issue P20
Revised interim stormwater management plan
Revised Lot 4 area plan - Issue P6
Revised Lot 4 Ground Floor Plan - Issue P14
CH1475-D230250 August 2023 Dust Monitoring
CH1475-D230312 September 2023 Dust Monitoring
CH1475-D230362 October 2023 Dust Monitoring
CH1475-D230396 November 2023 Dust Monitoring
CH1475-D240017 December 2023 Dust Monitoring
CH1475-D240040 January 2024 Dust Monitoring
CH1475-D240091 March 2024 Dust Monitoring
CH1475-D240125 April 2024 Dust Monitoring
DDG_Febuary 2024 Dust Monitoring
Live Dust Monitoring 24h - Feb24
SiteHive_Dust Monitoring 24hr - April 24
SiteHive_Live Dust Monitoring 24hr - Mar24
For any construction related enquiries relating to the Stage 1 Development, contact ESR directly:
Phone: 1800 270 980 (9am-5pm Monday to Friday)
Email: aus_development@au.esr.com
1. Modification Application
Modification Report
Appendix A - Statutory Compliance Table
Appendix B - Retaining Wall Comparison
Appendix C - Revised Wall Design CRC
Appendix D - Revised Wall Design DP
Appendix E - Stormwater & Civil Letter
Appendix F - Survey
Appendix G - Visual Impact Letter
Appendix H - Acoustic Letter
2. Agency Advice
SSD-9138102-Mod-4- Council Response Westlink Modification
3. Additional Information
SSD-9138102-Mod-4 RFI 250924
SSD-9138102-MOD-4 RFI 140524
Response to RFI - MOD 4 Westlink Stage 1
Attachment A - Updated Top of Retaining Wall
Attachment B - Boundary Elevation
4. Determination
SSD-9138102-Mod-4 Assessment Report
MOD 4 - North Boundary Retaining Wall
5. Consolidated Consent
SSD-9138102-Mod-4 Consolidated Consent
Westlink Stage 1 – Stage 3 Lot 3 OEMP
Stage 2 SSDA
1. Appendix OO3 - Construction Materials
2. Appendix OO2 - Building Materials
3. Appendix OO1 - Life Cycle Carbon Report
4. SSD-46983729 - Westlink Stage 2 - EIS
5. Appendix A - SEARs Compliance Table
6. Appendix B - Architectural Drawings
7. Appendix C - Statutory Compliance Table
8. Appendix D - Community Engagement Table
9. Appendix E - Consolidated Mitigation Measures
10. Appendix G1 - Detailed Site Survey (Lot 3, 4 DP 250002)
11. Appendix G2 - Site Survey (Lot 11, 12, 13 DP 253503)
12. Appendix H - Urban Design Report
13. Appendix I1 - Civil Drawings
14. Appendix I2 - On-lot Civil Drawings
15. Appendix J1 - Landscape Drawings
16. Appendix J2 - Landscape Drawings (Trunk Drainage Channel)
17. Appendix K1 - Landscape Report
18. Appendix K2 - Tree Canopy Plan
19. Appendix L - Remedial Action Plan
20. Appendix M - Civil Infrastructure Report
21. Appendix N - Water and Stormwater Management Plan
22.1 Appendix N - Flow Duration Curve - Westlink Stage 2
22.2 Appendix N - MUSIC Model - Westlink Stage 2
23. Appendix O - Sydney Water Correspondance
24. Appendix P1 - Trunk Drainage Letter
25. Appendix P2 - Trunk Drainage Drawings
26. Appendix Q - Plan of Proposed Subdivision
27. Appendix R - Bio-Certification Letter
28. Appendix S - Mamre Road Precinct DCP Compliance Table
30. Appendix U - Engagement Outcomes Report
31. Appendix V - ACHAR (Redacted)
32. Appendix W - BCA Assessment Report
33. Appendix X - Fire Safety Design Letter
34. Appendix Y - Visual Impact Assessment
35. Appendix Z - Transport Management
36. Appendix AA - Construction Traffic Management Plan
38. Appendix CC - Riparian Assessment Report
39. Appendix DD - Air Quality Impact Assessment
40. Appendix EE - Noise and Vibration Impact Assessment
41. Appendix FF1 - Desktop Geotechnical Assessment
42. Appendix FF2 - Geotech DD Assessment (1030-1048 Mamre Road)
43. Appendix FF3 - Geotechnical Letter
44. Appendix FF3 - Geotech DD Assessment (1050-1064 Mamre Road)
45. Appendix GG - CPESC Endorsement Letter
46. Appendix HH - Detailed Site Investigation
47. Appendix II - Flood Impact Assessment
48. Appendix JJ - Waste Management Plan
49. Appendix KK - Archaeological Report (Redacted)
50. Appendix LL - Heritage Impact Statement
51. Appendix MM - Social and Economic Impact Assessment
52. Appendix NN - Bushfire Hazard Assessment
54. Appendix OO4 - Embodied Emissions Materials Form (NSW SEPP)
1. Submissions Report - Westlink Stage 2 (SSD-46983729)_TOA
2. Appendix A - Submissions Register
3. Appendix B - Amended Architectural Drawings_TOA
4. Appendix C - Amended Estate Civil Drawings_TOA
5. Appendix C - CPESC Certification of ESCP
6. Appendix D - Amended On-Lot Civil Drawings
7. Appendix E - Trunk Drainage Drawings
8. Appendix F - Amended Plan of Subdivision
9. Appendix G - Updated Civil Infrastructure Report
10. Appendix H - Updated Water Management Plan
11. Appendix I - Trunk Drainage Design Report
12. Appendix J - Updated Swept Path Analysis
13. Appendix K - Updated Noise and Vibration Impact
14. Appendix L - Updated Landscape Report
15. Appendix L - 30m setback Landscape Drawings
16. Appendix M - Abbotts Intersection Design
17. Appendix N - LOG-E WAD (LOG-E Response 18-06-24)
18. Appendix O - Flooding Response
19. Appendix P1 - Remediation Action Plan (Part 1)
20. Appendix P2 - Remediation Action Plan (Part 2)
21. Appendix P3 - Remediation Action Plan Addendum
22. Appendix P4 - Interim Validation Letter
23. Appendix P5 - Asbestos Clearance Certificate
24. Appendix P6 - Asbestos Clearance Certificate
25. Appendix P7 - Site Remediation and Validation Report
26. Appendix P8 - Asbestos Management Plan
27. Appendix P9 - Long Term Environmental Management Plan
28.1 Flow Duration Curve - Westlink Stage 2
28.2 MUS008-02-20-748-WESTLINK STAGE 2 WITH ERSED
1. Additional Information advice - PCC
2. Additional Information advice - DCCEEW Water
3. Additional Information advice - CPHR 1
4. Additional Information advice - TfNSW
5. Additional Information advice - CPHR 2
6. Additional Information advice - CPHR 5
12. RTS advice - NSW DCCEEW Water
21. Additional Information advice - CPHR 6
26. Additional Information advice - CPHR 3
27. Additional Information advice - CPHR 4
1. SSD-46983729 AQIA RFI 150825
2. Stormwater Interim Arrangement Plan Sep 25
3. MUS008-03-20-748-WESTLINK STAGE 2 RFI
4. Water and Stormwater Management Plan Sep 2025
5. Final Civil Plan Pack Sep 2025
6. Response to Requests for Additional Information
7. Attachment A - Response to RFI
8. Attachment B - Response to RFI
9. Attachment C - Updated Architectural Drawings
10. Attachment D - Landscape Drawings
11. Attachment E - Updated Plan of Subdivision
12. Attachment F - Updated Estate Civil Drawings
13. Attachment G - Updated On-Lot Civil Drawings
14. Attachment H - Updated Civil Infrastructure Report
15. Attachment I - Updated Water and Stormwater Management Plan
16. Attachment J - Updated Trunk Drainage Drawings
17. Attachment K - Updated Trunk Drainage Design Report
18. Attachment L - Updated Flood Impact
19. Attachment M - Transport Addendum
20. Attachment N - Updated Noise and Vibration Assessment
21. Attachment O - Updated Air Quality Impact Assessment
22. Attachment P - Aboriginal Cultural Heritage Addendum Letter
23. Attachment Q - Updated Consolidated Mitigation Measures
24. Attachment R - Mamre Road DCP Compliance Table
25. Attachment S - CPCP Land Category Map
26. Attachment T - Wildlife Management Plan
27. Attachment U - Groundwater Letter
28. Attachment V - Remediation Action Plan Addendum
29. Attachment W - TfNSW Response to Trunk Drainage
30. Attachment X - Transgrid Response to Trunk Drainage
31. Attachment Y - Acceptance - Asset Relocation Application
32. Attachment Z - Trunk Drainage Channel Shadow Diagrams
33. Attachment AA - Letter of Offer to Penrith City Council
34. Attachment BB - Council Comments on Letter of Offer
35. Updated Flow Duration Curve (SSD-46983729)
37. Updated Flow Duration Curve (SSD-46983729)
38. RFI 3 Response letter - Aug 2025
39. RFI 3 Attachment A Penrith City Council Letter of Acceptance
40. RFI 3 Attachment B TfNSW Road Lot 6 Coordinated Design
41. RFI 3 Attachment C Flood Impact and Risk Assessment
42. RFI 3 Attachment D-1 Civil and Stormwater Plan - Estate
43. RFI 3 Attachment D-2 Water and Stormwater Management Plan
44. Attachment D-3 MUSIC Model
45. RFI 3 Attachment D-4 Interim Stormwater Plan Westlink Stage 1-2
46. SSD-46983729 Traffic RFI 170424
47. SSD-46983729 AQIA RFI 300424